TOPData entry support tool
- T-3:Is the tool compatible with other schemes such as IPC-1752A, BOMcheck and IMDS?
- T-6:Does the tool work with Windows 10?
- T-10:Is there a rule for file names when exchanging data in the supply chain?
- T-13:“Computer protected by Windows” is displayed and the chemSHERPA tool does not launch.
- T-16:When we conducted an error check for the conversion imported AIS data on the composition screen, we were asked to enter the SVHC substance use fields. What should we do?
- T-1:The tool is not activated.
- T-4:Is it possible to read chemSHERPA-CI (chemical product) data using chemSHERPA-AI’s (article) data entry support tool?
- T-7:When the user needs to judge whether to enter Y or N for “Entry Y” at the time of converting from component to legal compliance judge, should “N” be entered, because the usage under the applicable exemption is not against the law?
- T-11:Options are not correctly displayed on the exclusion selection screen of the article tool when inputting component information.
- T-14:When the version of .Net Framework is indicated as v4.0.30319 in the system information of the tools, the later version of it is indicated in the control panel of PC. Is it a problem or not?
- T-17:When we conducted an error check for the conversion imported AIS data on the composition screen, field of substance names in Japanese that should have been entered from the AIS data were left blank and there was an error. What should we do?
- T-2:Is IEC62474 conformity data other than chemSHERPA readable?
- T-5:Why does the tool have a usage deadline?
- T-9:With regards to the chemical products, is it permitted to submit a printed ledger sheet (Excel format) output by the tool, not digital data in .shci format?
- T-12:“Are there any rules for setting computer’s date?”
- T-15:We convert the AIS data we entered in the past and use it. After conducting an error check on the composition screen, we received the error “Combinations of usage (material) and classification symbol (material) are incorrect”. What should we do?
- T-8:In the downstream side of the supply chain, is there a possibility that the data size of chemSHERPA-AI will become too large to receive an attached file in an e-mail? Or could the tool become too slow for practical operation when reading data?